EarthQuake 9010140 Chipper User Manual


 
Page 13
GetEarthquake.com
1-800-345-6007
Initial Assembly
Figure 26. Discharge Bag - North American Models
Figure 27. Discharge Bag - CE Models
Install Discharge Bag
This product comes with a discharge bag for collection
of debris as it exits the discharge chute. Install the bag as
shown in Figure 26 or 27.
Add Engine Oil
Refer to “Engine Oil Type and Capacity” in the Regular
Maintenance section for oil type and fill procedures.
Add Fuel
Refer to “Adding Fuel” in the Operation section for fuel
specifications and filling procedures.
Pull drawstring tight.
Lift discharge
chute and slide
bag over chute.
Make sure bag
noose fits over
top of discharge
chute and notch
in chute bottom.
Slide bag over dis-
charge chute.
Make sure bag
noose fits over top
of discharge chute
and notch in chute
bottom.
Pull drawstring tight.
Slide bag over dis-
charge chute.
Make sure bag
noose fits over top
of discharge chute
and notch in chute
bottom.