Craftsman 917.29239 Tiller User Manual


 
UNPACK CARTON & INSTALL
HANDLE
A, CAUTION: Be careful of exposed sta-
ples when handling or disposing of carton-
ing material.
IMPORTANT: When unpacking and as-
sembling tiller, be careful not to stretch or
kink cable(s).
Cut cable ties securing handle column.
Slowly lift handle column up and slip
over handle mount.
Remove packing from carton.
Secure handle column to handle mount
using two (2) carriage bolts and two (2)
flange Iocknuts. Tighten both flange
Iocknuts securely.
Remove packing material from handle
assembly.
Insert plastic cable clip into hole in han-
dle column.
Route fine control cable through plastic
cable clip on handle column.
Cut away carton.
: Cut cable ties securing tiller to skid.
Remove tiller from skid by pulling back-
wards.
Tine
Tine Control Cable
Handle Mount
Column
"line Control
Cable
\
Engine Bracket Halves
Nut "A"
Depth Stake
\
Stake
Support Bolt
lex Bolts Lockwashers
and Rex nuts
HANDLE HEIGHT
Handle height may be adjusted to better
suit operator. (See "HANDLE HEIGHT"
in the Service and Adjustments section
of this manual).
TILLING WIDTH
Tilling width may be adjusted to better
handle your tilling conditions (See "TINE
ARRANGEMENT" in the Service and
Adjustments section of this manual).
TINE OPERATION
Check tine operation before first use.
(See "TiNE OPERATION CHECK" in the
Service and Adjustments section of this
manual).
cable
clip
Carriage
Bolts Flange Iocknuts
INSTALL DEPTH STAKE ASSEMBLY
, Loosen nut "A".
Insert stake support between engine
bracket halves with stake spring down.
i olt stake support to engine brackets
with bolts, lock washers and nuts.
Tighten securely. "13ghtennut "A". ;
Depth stake must move freely. If it doe_
not, loosen support bolt.
!' 6