![](http://pdfasset.owneriq.net/b/c3/bc3255cf-49b1-4cf1-96f6-d7527263c228/bc3255cf-49b1-4cf1-96f6-d7527263c228-bg44.png)
OPERATION
1035 01/11 Operation Section 4-28
© 2011 Alamo Group Inc.
OPERATION
Side cutting is a good technique for cutting down a
big pile.
If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until a
slot can be cut over the top.
Another method for large dirt piles is to build a ramp
approach to the pile.