500Z 26HP - 48” Mower Deck
TP 300-7368-IR-ZT-N
1/20082
Quick Setup List -
Page Setup Procedure Steps to Perform
3 Uncrating ❏ Remove Crate & Banding.
❏ Disengage Transmission Release Levers.
❏ Release Parking Brake and Roll Tractor forward off skid.
❏ Engage Transmission Release Levers.
3 Battery Installation ❏ Install Battery.
4 Tractor Assembly ❏ Assemble the Ground Speed Control Levers.
❏ Assemble the Seat.
5 Check Fluid Levels ❏ Check Engine Oil level.
❏ Check Hydraulic Oil level.
❏ Check Tire Pressure
6 Check Mower Assembly ❏ Check Blade Bolt Torque.
❏ Check & Adjust Deck Lift Rod Timing.
❏ Check & Level Mower Deck.
❏ Check Deck Drive Belt.
10 Lubrication & ❏ Lubricate all grease & oil points.
Fuel Preparation ❏ Add fuel.
❏ Start the Engine.
12 SAFETY CHECKS ❏ Check for LOOSE HARDWARE.
❏ Check all OPERA
T
OR CONTROLS.
❏ Perform SAFETY INTERLOCK SYSTEM CHECK
.