GB - 9
PACKAGE CONTENTS
ASSEMBLY
Tools Required:
•Pliers
• Open-End Wrenches: 3/8, 7/16, 1/2,
9/16 in. and/or Adjustable Wrench
• Tire Gauge
Unfold Handlebar (Figure 4)
1. Remove the lower and loosen the upper wing
knobs on the handlebar assembly.
2. Loosen the wing nuts on the shift rod.
3. Put the speed selector lever in the first forward
position.
4. Rotate the handlebars into operating position.
5. Install and tighten all wing knobs and wing nuts
on the handlebar assembly and shift rod.
Install Discharge Chute
(Figure 5)
1. Grease underside of discharge chute ring (if not
already greased).
2. Remove mounting hardware from the bottom of
the chute pedestal.
3. Install discharge chute over opening in the auger
housing and secure pedestal to auger housing
with hardware removed in step 2.
ASSEMBLY
WARNING: AVOID INJURY. Read and
understand the entire Safety section before
proceeding.
WARNING: Dropping or tipping over boxed
unit could result in personal injury or damage
to unit.
Figure 3
1.Sno-Thro Unit
2.Chute Crank
3.Discharge Chute
4.Literature Pack with
Extra Shear Bolts
1
2
3
4
Figure 4
1.Wing Knob
2.Lower
Handlebar
3.Wing Nuts
4.Upper
Handlebar
1
OS3000
2
4
3