5
♦ Remove all packing materials from shipping box. Check that all foam
and plastic padding is removed.
♦ Place Liquid Control Unit on a flat surface.
♦ Put a Tank beside Liquid Control Unit and connect a 6mm PU tube
between Tank & Liquid Input Adapter
♦ Connect 6mm PU tube from Liquid Output Adapter then extend this
tube to
four Z-1200 fog machine (S-100IIs / ICEs). Each terminal use FT-6 ,
FTA-64
and FTA-664 divide liquid flow direction.
♦ Firmly attach the remote control cable to the proper input on the rear
of the machine.
♦ If you are connecting the machine to a DMX controller or in a daisy
chain of DMX controlled devices ensure the various cables are
connected to the proper socket on the back of the fog machine.
Operation