Execute the Site Plan
87
Execute the Site Plan
To ensure site preparation is complete by the scheduled equipment delivery date, the customer should
arrange for contractors as soon as the plan has been laid out and computer room requirements are
determined. All major facility changes and primary power and air conditioning installation should be
completed 30 days prior to the scheduled installation date.
The Hewlett-Packard site preparation specialist may assist in arranging for the necessary contractors if
requested by the customer.
It is the customer’s responsibility to ensure their computer system site is in compliance with all local laws,
regulations, and codes for mechanical, building, and electrical distribution systems prior to system
installation. The Hewlett-Packard site preparation specialist can assist the customer in determining the local
regulations.