Machine Preparation
1. Park machine on a level surface and set brake.
2. Remove ROPS and hardware from shipping box and identify all parts using
the parts list noted above.
Lower ROPS Leg Tube Installation
3. Jack and secure rear of mower and remove rear tires.
4. Remove left side rear fuel tank bracket bolts. Support tank.
5. Place LH leg weldment against LH machine frame mounting location.
6. Secure using (3) 7/16-14NC x 1.25” long hex head bolts, (3) 7/16-14NC
nylock hex nuts, (3) 3/8-16NC x 1.25” long hex head bolts and (3) 3/8-16NC
nylock hex nuts. Tighten bolts and nuts later in these instructions. See
Figure 1.
7. Loosen high pressure hoses at the pump and swivel away from LH leg
weldment.
Figure 1
8. Remove right side rear fuel tank bracket bolts. Support tank.
9. Repeat step 5-7 for installing RH leg weldment to RH side of machine frame
mounting location. See figure 2.
Figure 2