www.ultratecfx.com
7
Operating Procedure
1. The fog machine must be connected to a grounded supply of at least 15 amps free of any interference.
2. Open a 20 Litre (5 Gallon) container of Ultratec Special Effects fog uid and insert the uid pickup tube into the
spout of the uid container.
3. Connect the Remote Handset into the rear panel connector located on the rear panel. (When using DMX the
Remote is not required).
4. Activate the Power switch located on the rear panel. The Power switch and Handset indicator will illuminate to
indicate the presence of power. If the Handset indicator does not illuminate, ensure the connector is properly
inserted.
5. The Handset indicator will begin to ash slowly, but will speed up
when the fog machine is ready to operate. After approximately 9
minutes, the fog machine will be fully heated and is ready for full
output; the indicator will be on solid.
6. It may be necessary to prime uid into the system to expel any
air. The Variow control on the remote handset should be set to
the full position. A dry hose can take between 45-60 seconds to
prime. This only needs to be done if the unit was left to run dry.
7. To adjust the depth of the hose, simply loosen Nut ‘A’ and slide
up or down the hose and retighten. Be careful not to pinch off
the ow of uid.
NOTE: In order to prime the fog machine, the Handset Indicator must be a solid red.
Operating Procedure w/ Air Option
A) Mount the Regulator Bracket to a wall or other secure
location.
B) Attach the female coupler to the male coupler of the
Power Fog Industrial w/ Air Option or Power Fog Industrial
9D w/ Air Option.
C) Attach the air hose to the male coupler of the mounted
regulator.
D) Adjust for the desired air pressure (typically 25-50 psi).
A
C
D
B
A
A
A