Strong Pools and Spas Strong Spas The Antigua Hot Tub User Manual


 
6
Startup Preparations
- Make sure that if spa is equipped with gate valves, that valves are opened. (Usually found
in the Antigua spas, these gate valves are easily noticed in your access area by the distinct
“T” shaped handle.)
- When filling your spa remove the filter, and place hose into filter area.This will fill the plumb-
ing first, and hopefully reduce the chance of air lock.
- Fill your spa at least 2” above top jets.
- Spa capacity: 280 gallons/1060 liters
POWERING SPA
110 Volts (Classic Edition)
Spa must be on a dedicated line, meaning there are no other appliances on this circuit, and it
will need a 20 amp breaker. (Strong Industries recommends that only one GFCI be present
on the circuit, and that the owner follows any local building codes)
220 Volts (Elite and Platinum Editions)
The Antigua Elite (if converted) must have no lower than a 35 amp breaker, the Antigua
Platinum requires a 50 amp breaker. (Strong Industries highly recommends a certified electri-
cian performs the wiring of the spa.)
- Power up spa, Controls will read the program # (r59), then 30 seconds top control should
read “PUR”(This is setting was creat-
ed in order to clear the pump of any
air unwanted air in that area.)
A- Most spas do not require pump
priming
B - Purge will clear lines of un-
desired air pockets
C - If pump makes inconsistent
sounds, “cavitations”,then it will need
primed (this can be done by loosen-
ing the unions)
- Top display will then read water
temperature.
Due to the variations in spas and
outside conditions, spas may take
up to 24 hours to reach desired
temperature.