Roberts Gorden BH-150 Patio Heater User Manual


 
SECTION 5: MAJOR COMPONENTS
11 of 59
SECTION 5: MAJOR COMPONENTS
FIGURE 13: Major Component Descriptions
Burner with Tube Gasket
Must be installed with the
flame observation window
facing down.
Reflector (Aluminum or
Stainless Steel)
Alternate overlap as shown on
overview and on Page 17,
Figure 16. Minimum overlap is
6'' (16 cm).
Tube and Reflector Hanger
with Clamp Package
Position this hanger no more
than 4” (10 cm) away from the
burner.
Coupling Assembly with Lock
Reflector End Cap
Punch out center section to
accommodate tube.
Tube and Reflector Hanger
Suspend system from these
hangers.
Flex Gas Line with
Shut Off Cock
Tube
Hot rolled or heat treated
aluminized tube supplied in
10' (3 m) lengths.
Burner Tube
Supplied in 10' (3 m) lengths.
Burner tube is always the first
tube after the burner.
Reflector Support Strap &
Wire Form
Turbulator
Turbulator must be installed in the
last standard section of tube.
Turbulator is not required on the
BH-125/150/175/200. For
installation, see Page 21, Step 6.4
Vent Adapter