Poulan 402345 Lawn Mower Accessory User Manual


 
7
02552
LOWER CHUTE (See Fig. 5)
1. Raise and hold defl ector shield in upright position.
2. Place slot in lower chute over tab on mower deck and
position lower chute over deck opening as shown.
3. Hook rear latch into fl ange hole on back of mower
deck.
4. Hook front latch into tab hole on front of mower deck.
5
CAUTION: Do not remove defl ector
shield from mower. Raise and hold
shield when attaching lower chute
and allow it to rest on chute while in
operation.
REAR LATCH
FRONT
LATCH
DEFLECTOR
SHIELD
FIG. 5
LEVEL MOWER DECK
Be sure deck is properly leveled for best mower per for mance.
See your tractors owner's manual for instructions.
7
TAB
OPTIONAL FRONT
GAUGE WHEEL
W
AR
N
I
N
G
Do
n
o
t
o
p
e
r
a
t
em
o
w
e
ru
n
l
e
s
s
c
o
n
t
a
i
n
e
ri
s
p
ro
p
e
r
l
y
is
n
s
ta
l
l
e
d
.
Con
t
a
i
n
e
r
i
s
s
u
b
j
e
c
t
t
o
w
e
a
r
a
n
d
d
e
t
i
e
r
i
o
r
a
t
i
o
n
.
C
h
e
c
k
b
a
g
fre
q
u
e
n
t
l
y
.
Re
p
l
a
c
e
w
h
e
n
c
r
a
c
k
e
d
o
rd
a
m
a
g
e
d
.
U
s
e
o
n
l
y
a
re
c
o
m
m
e
n
d
e
d
r
e
p
l
a
c
e
m
e
nt
c
o
n
t
a
i
n
e
r
.
W
AR
N
I
N
G
D
o
n
o
t
o
p
e
r
a
t
e
m
o
wer
u
n
l
e
s
s
c
o
n
t
a
i
n
e
ri
s
p
ro
p
e
r
l
y
i
s
n
s
t
a
l
l
e
d
.
C
o
n
t
a
i
n
e
r
i
s
s
u
b
j
e
c
t
t
o
w
e
a
ra
n
d
d
e
t
i
er
i
o
r
a
t
i
o
n
.
C
h
e
c
k
b
a
g
f
r
e
q
u
e
n
t
l
y
.
R
e
p
l
a
c
e
w
h
e
n
c
r
a
c
k
e
d
or
d
a
m
a
g
e
d
.
U
s
e
o
n
l
y
a
r
e
c
o
m
m
e
n
d
ed
r
ep
l
a
c
e
m
e
n
t
c
o
nt
a
i
n
e
r
.
03022
CONTAINER MOUNTING (See Fig. 4)
1. Install one container to left side fi rst with warning to
outside of unit. Install another container to center
position and one in right position.
NOTE: Right con tain er should always over lap left con tain er
at center supports.
2. Close cover and lock latch handles over center support
tubes.
4
FIG. 4
COVER LATCH
HANDLES
CONTAINER
WARNING
CONTAINER
HANDLE
CONTAINER
WARNING
CENTER
SUPPORT
TUBES
03029
UPPER CHUTE (See Figs. 6A & 6B)
1. Lower mower to its lowest cutting position.
2. Assemble upper chute by inserting curved end into
hole in back of cover.
NOTE: Handle carefully so as not to damage full bagger
indicator.
3. Push in and turn upper chute until it is in line with lower
chute.
4. Align the bosses on lower chute with alignment slots
on upper chute and slide together.
5. Secure with rubber latch by hooking hole in latch over
latch pin.
6
COVER
HANDLE
LOWER
CHUTE
FULL BAGGER
INDICATOR
UPPER
CHUTE
FIG. 6B
FIG. 6A
03023
BOSSES
LATCH PIN
ALIGNMENT
SLOT
RUBBER
LATCH