Installation Instructions
Drive Assembly
605NT and 3P605NT Drive
NOTE: If your drill is equipped with a native grass
option, a majority of the agitator drive is already
installed. Go to
page 4 for chain routing.
See
Figure 3
605NT & 3P605NT Drive Assembly
18662
Figure 3:
1. Mount bearings and flanges (1) to left side of
drill frame and to the frame support as shown.
Use 5/16 x 1 inch bolts (2), washers and nuts
to secure flanges. Leave bolts loose.
2. Install drive shaft (3) through bearings. As you
install shaft, place 17 tooth sprocket (4) on
shaft near left side of drill frame.
3. Place 17 tooth sprocket (5) on the right end of
shaft.
4. Install three 12 tooth idler sprockets (6) in lo-
cations shown, using a 1/2 x 3-1/2 inch bolts
(7), hex jam nuts (8), USS flat washers (9)
and hex flange nuts (10).