READY WHEN YOU ARE
UNIQUE EASYLOCK SYSTEM.
1 Drive the tractor into the parked loader.
The couplings latch smoothly into the
drop forged attachment hooks.
2 Lift hydraulic and electric connector from
designated carrier and connect with the
single point Multi quick coupler.
3 Lift the loader arms to engage the hooks.
4 Lock the towers and the arms together
using the side handles.
5 Fold up the Varipark stands.
6 Job Done.
FAST FITTING AND REMOVAL
All New Holland loaders are supplied
with integrated Varipark self-levelling
stands and the Multi Quick coupler for
single point hydraulic system coupling.
The loader is attached using a simple
latch system for fast fitting and removal.
1 6
2
3
4
5