McCulloch M12T92RB Lawn Mower User Manual


 
25
2
To Assemble Bagger
NOTE: For ease of assembly, you may wish to obtain the
assistance of another person when putting the bagger to-
geth er.
Holes in front bagger tube are at an angle. Place front
bagger tube against lower bagger tube and check for
proper hole alignment before assembling bolts.
Assemble front and lower bagger tubes using four (4)
1/4 x 50,8mm carriage bolts and lock nuts supplied.
Tighten se cure ly.
Slide front and lower bagger tube assembly into the bag-
ger assemby.
Assemble front and upper bagger tubes using four (4)
1/4 x 50,8mm carraige bolts and lock nuts supplied.
Tighten se cure ly.
Slip all the vinyl bindings over the bagger tubes
Slide the bagger dump handle through the hole in the
bagger top, install the clevis pin and secure with retainer
spring.
Push cap over end of bagger dump handle.
NOTE: For future use, the clevis pin may be removed in order
to use the handle to clear the chute in the event it has become
clogged.
Bagger adjustment
For proper bag function and appearance, it may be nec es -
sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gap between the bagger top and fender and
the bagger top surface should be even with the top surface
of the fender. To adjust bagger position:
Horizontal adjustment
Slightly loosen the nuts securing the bagger RH and LH
hor i zon tal adjustment brackets. Loosen only enough so
the brackets keep their position, but allow them to be
moved.
Move the brackets the amount forward or back ward you
wish the bag assembly to move. Retighten the nuts se-
curely.
Vertical adjustment
Slightly loosen the nuts securing the vertical adjustment
brackets. Loosen only enough so the brackets keep their
position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
Reinstall the bagger as sem bly and check the bagger to
fender fit. If necessary, repeat the procedure until proper
fit is attained.
To convert to bagging, mulching or discharge
See "Sec tion 5" of this manual.
0
25
9
2
0
2
5
9
3
2
4
1
3
5
6
2
7
1
4
1. Front bagger tube
2. Lower bagger tube
3. 1/4 x 50,8mm Car riage
Bolts
4. 1/4 Lock nut
1. Front bagger tube
2. 1/4 x 50,8mm Car riage
Bolts
3. 1/4 Lock nut
4. Vinyl Binding
5. Dump handle tube
6. Clevis pin
7. Retainer spring
8. Cap
02329
1
1. Top Surfaces Even
2. Horizontal Adjustment Brack et
3. Vertical Adjustment Brack et
3
6MM (1/4") - 9MM (3/8")
2
3
8