13
LITTLE
WONDER
BLOWER
ADJUSTMENTS
DEFLECTOR LEVER
If the deector door moves from the set position dur-
ing operation, tighten the deector lever pivot bolt just
enough to keep the deector in place. DO NOT over
tighten, the handle tube could crush.
HORIZONTAL DEFLECTOR
Adjust the jam nuts on the cable conduit so the deec-
tor door is completely closed when the deector lever is
moved all the way forward. (Figure 1)
DEFLECTOR CHAIN
The sprocket needs to be installed on the deec-
tor as shown. The chain consists of 2 master links,
6 roller links, and 5 pin links. The middle pin link
should be over the center tooth of the sprocket.
(Figure 2)
If large amounts of adjustment are required, the
chain can be moved one pitch on the sprocket to
gain 1/2” of adjustment.
FIGURE 1
FIGURE 2