Husqvarna CTH2542 TWIN Lawn Mower User Manual


 
8
FIG. 4D
NOTE: The strap hook must go through the discharge chute
only. Do not allow the hook to enter the slot in the tractor
back plate. This will allow the dis charge chute to float with the
mower deck when moving on uneven terrain.
02
306
HOOK
BACKPLATE
SLOT
DIS CHARGE
CHUTE
FIG. 5A
TO ASSEMBLE BAGGER (See Figs. 5A-5C)
Unfold bag by pivoting front bagger tube all the way
forward and pressing the bottom vinyl binding onto the
tube.
Inside the bag, install spreader bars and retainer springs
onto pins on both sides of bag as shown.
Press the vinyl bindings onto the sides of front bagger
tube.
Slide the bagger dump handle through the hole in the
bagger top, install the clevis pin 10 x 44mm and secure
with retainer spring.
Push cap over end of bagger dump handle.
NOTE: For future use, the clevis pin may be removed in order
to use the handle to clear the chute in the event it has become
clogged.
FIG. 5C
ASSEMBLY
FIG. 4B
Using the nuts and flat washers removed from tractor
back plate, install the bagger support tube to the back
plate as shown. Tighten securely.
Install the two upper support brack ets through the back
plate and to the chas sis, install the clevis pin 10x17mm
and secure with retainer spring.
Assemble both support brackets to the outside of the
bagger support tube using two each 3/8 x 63,5mm hex
bolts13/32" I.D. flat washers and 3/8 locknuts from parts
bag. Tight en securely.
Replace discharge chute into rear opening of tractor.
Secure the chute with the two hook straps.
02330
SUP PORT
TUBE
FLAT
WASHER
3/8 NUT
BOLT
FIG. 4C
0
2
5
9
0
CLEVIS PIN 10 X 17MM
3/8 LOCK NUT
SUPPORT BRACKET
10,3MM (13/32")
FLAT WASHER
3/8 X 63,5MM HEX BOLT
RETAINER SPRING
BAGGER ADJUSTMENT (See Fig. 6 & 7)
For proper bag function and appearance, it may be nec-
es sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gap between the bagger top and fender
and the bagger top surface should be even with the top
surface of the fender. To adjust bagger position:
0
2
9
0
5
VINYL BINDING
FRONT BAGGER TUBE
0
2
9
06
RETAINER SPRING
SPREADER BARS
RETAINER
SPRING
VINYL
BINDING
FIG. 5B
029
0
7
DUMP HANDLE
TUBE
CLEVIS PIN 10 X 44MM
RETAINER SPRING
CAP