Husqvarna 356 BT X-series Blower User Manual


 
ASSEMBLY
12 – English
Assembling the blow pipe and
control handle
Loosen the two screws on the fan’s outlet pipe and
remove the two wear ring halves located on the outlet
pipe.
Place these on the pipe bend so that the guide on the
wear ring halves aligns with the slot on the pipe bend.
Refit the pipe bend with the wear halves in the fan’s
outlet pipe. Make sure the holes in the wear ring
halves align with the screws that are used to secure
the halves in the pipe bend.
Also pay attention to the stops located on the pipe
bend and the fan’s outlet pipe. Ensure that the stop on
the pipe bend comes in front of the stop on the outlet
pipe.
Refit the bolts and tighten well. Check that the control
pipe is in the right position and can rotate equally in
both directions.
Disassemble the knob from the control handle and
push the holder on to the control pipe.
Assemble the knob and adjust position and angle to
achieve comfortable working position, tighten the
knob. Attach the cabling in the cover.
Connect the intermediate pipe and air nozzle. Push the
pipes together and turn them so they lock in relation to
one another.