Homelite HG5022P Portable Generator User Manual


 
Page 9 — English
POWER MANAGEMENT
To prolong the life of the generator and attached devices,
it is important to take care when adding electrical loads to
the generator. There should be nothing connected to the
generator outlets before starting its engine. The correct and
safe way to manage generator power is to sequentially add
loads as follows:
1. With nothing connected to the generator, start the engine
as described later in this manual.
2. Plug in and turn on the first load, preferably the largest
load you have.
3. Permit the generator output to stabilize (engine runs
smoothly and attached device operates properly).
4. Plug in and turn on the next load.
5. Again, permit the generator to stabilize.
6. Repeat steps 4 and 5 for each additional load.
Never add more loads than the generator capacity. Take
special care to consider surge loads in generator capacity
as previously described.
CAUTION:
Do not overload the generator’s capacity. Exceeding the
generator’s wattage/amperage capacity can damage the
generator and/or electrical devices connected to it.
Application/Equipment
Estimated
Run Watts
Estimated
Starting
Watts
Emergency / Home Standby
Clock Radio 50 50
Lights (qty. 4 x 75 W) 300 300
Refrigerator 700 2200
Furnace Fan 800 2350
Water Well Pump 1000 1500
Microwave 1000 1000
Sump Pump 1050 2200
Electric Range (per element) 2100 2100
Job Site
ElectricDrill−1/2HP 600 900
AirlessSprayer−1/3HP 600 1200
Quartz Halogen Work Light 1000 1000
Reciprocating Saw 960 1920
AirCompressor−1HP 1600 4500
CircularSaw−7-1/4in. 1400 2300
Planer/Jointer−6in 1800 1800
MiterSaw−10in. 1800 1800
TableSaw/RadialArmSaw−10in. 2000 2000
*Wattages listed are approximate. Check tool or appliance for actual wattage.
ELECTRICAL