Generac
®
Power Systems, Inc. 37
Section 3 – Post-installation Start-up Adjustments
PRIMEPACT 50 Recreational Vehicle Generator
3.5 INSTALLATION CHECKLIST
LOCATION AND SUPPORT
❑ Generator is properly located.
❑ Generator is properly supported.
❑ Generator is properly restrained.
GENERATOR COMPARTMENT
❑ Compartment construction is proper.
❑ Holes/Openings are vapor-sealed.
❑ Compartment size is correct.
❑ Compartment is vapor-sealed.
❑ Sound insulation is correct.
❑ Floor cutouts are properly completed.
COOLING AND VENTILATING AIR
❑ Airflow is adequate.
❑ Air inlet opening is correct.
❑ Compensate for restrictions.
❑ Check that installation has been tested.
GASOLINE FUEL SYSTEM
❑ Fuel tank complies with all applicable codes.
❑ Fuel system is properly installed and checked
for leaks.
OPTIONAL LP GAS FUEL SYSTEM
❑ Fuel system is properly installed and checked
for leaks.
❑ Pressure at regulator inlet is correct.
❑ Rated flow of primary regulator is correct.
❑ All parts are properly installed.
❑ Fuel system is properly tested/adjusted.
EXHAUST SYSTEM
❑ Exhaust system complies with all applicable
codes.
❑ Exhaust system is properly and safely installed.
ELECTRICAL CONNECTIONS
❑ Connections comply with local code requirements
and all National Electrical Codes.
❑ Junction box is properly installed.
❑ Wiring meets all standards.
❑ All connections are correct.
❑ Conduit is properly installed and sealed.
❑ Generator is properly bonded to the vehicle.
BATTERY INSTALLATION
❑ Recommended battery is installed.
❑ Recommended cables are installed.
❑ Cables are clean and tight.
❑ Cables are connected properly.
❑ Proper ventilation is provided.
❑ Terminals are coated with anti-corrosion grease,
and terminal covers are positioned.
OPTIONAL ACCESSORIES
❑ Check that remote start/stop panels (if used) are
installed properly.
❑ Check that hourmeter kit (if used) is installed
properly.
❑ Check that any other options and accessories (if
used) are installed properly.
POST INSTALLATION TESTS
❑ Check that all tests are completed properly.
◆
◆
◆
◆
◆
◆
◆
◆
◆
◆
DATE OF INSTALLATION ____________________________________________________
NAME OF INSTALLER ______________________________________________________
SIGNATURE OF INSTALLER ________________________________________________