Echo PB-200 Blower User Manual


 
9
POWER BLOWER
OPERATOR'S MANUAL
ASSEMBLY
WARNING DANGER
Never perform maintenance or assembly procedures with engine
running or serious personal injury may result.
BLOWER APPLICATION
Install Blower Pipes
1. Align grooves in straight pipe with pegs on blower housing and
slide pipe onto housing.
2. Turn straight pipe clockwise to lock into place.
3. Align grooves in fan head nozzle with pegs on straight pipe and
slide fan head nozzle onto straight pipe.
4. Turn fan head nozzle clockwise to lock into place.
OPERATION
NOTICE: Use of unmixed, improperly mixed, or fuel older than 90 days, (stale fuel), may cause hard starting, poor
performance, or severe engine damage and void the product warranty. Read and follow instructions in the Storage
section of this manual.
FUEL
WARNING
Alternative fuels, such as E-20 (20% ethanol), E-85 (85% ethanol) or any fuels not meeting ECHO requirements are
NOT approved for use in ECHO 2-stroke gasoline engines. Use of alternative fuels may cause performance problems,
loss of power, overheating, fuel vapor lock, and unintended machine operation, including, but not limited to, improper
clutch engagement. Alternative fuels may also cause premature deterioration of fuel lines, gaskets, carburetors and
other engine components.
Fuel Requirements
Gasoline - Use 89 Octane [R+M/2] (mid grade or higher) gasoline known to be good quality. Gasoline may contain up to
10% Ethanol (grain alcohol) or 15% MTBE (methyl tertiary-butyl ether). Gasoline containing methanol (wood alcohol) is
NOT approved.