To place the new belt begin by routing the belt around the 5.
two outer spindle pulleys, then around the front spindle
pulley as shown in Fig. 7-8.
Route the belt around the two deck idler pulleys as shown 6.
in Fig. 7-8.
Retighten the belt keeper rod loosened earlier.7.
Remount the belt guards removed earlier.8.
Re-install the deck making sure the belt remains routed 9.
around the pulleys as instructed.
While holding the belt and pulley together, rotate the
pulley to the left (See Fig. 7-9). Continue holding and
rotating the pulley and belt until the belt is fully rolled into
28 se c t i O n 7— se r v i c e