NOTE
This unit is shipped WITHOUT GASOLINE
or OIL, After assembly, see operation
section of this manual for proper fuel and
engine oll recommendations
ASSEMBLY INSTRUCTIONS
Tools Required for Assembly:
121 7/16" Open End or Box Wrenches"
(1) 1/2" Socket Wrench
* An Adiustable Wrench may be used in place of one
of the wrenches
NOTE
The right and left side of your chipper-
shredder is determined from behind the
unit,
o--@@
FIGURE 1,
UNPACKING
Remove the chipper-shredder and loose parts from the
carton,, Make certain all parts and literature have been
removed before the carton is discarded,
Parts in Carton:
Chipper-Shredder
Chute Deflector
Hopper
Upper Leaf Ramp Section
Catcher Bag
Hardware Pack
Safety Glasses
Contents of Hardware Pack (See Figure 1):
A (8) Hex Bolts 1/4-20 x 1/2" Long
B (8) Hex Lock Nuts 1/4-20 Thread
C t6) Hex Washer Head Self-Tapping Screws
5/16-18 x 3/4" Long
D (2) Keepers
Hex Bolts (A)
Hex Lock
..,_.Nuts
j-
Chute
Deflector
CHUTE DEFLECTOR INSTALLATION
1, Place the chute deflector in position on the
discharge opening (on the left side of the chipper-
shredder) See figure 2
2 Secure chute deflector to discharge opening with
hex bolts (A) and hex lock nuts IB) Heads of the
hex bolts are inside the discharge opening Hex nuts
go on the outside
3 Tighten all four nuts and bolts securely
FIGURE 2.