Theouterdiameterof thethreadedendis 15/16".
lOa.
lOb.
lla.
llb.
llc.
Determinewherethe flexibleconduit will passthrough the housefrom inside to outside.
Whenyouarecertainyouhaveclearanceoneachsideandwithin the wall, drill a small pilot
holethrough the wallto markthe location.
Usinga holesaw,drill a 1-3/4 inchdiameterhole in the house'swall to allow the conduit
to fit through.
Fromthe insideofthe house,feed the endof the 30-foot conduit(which is pre-wiredfrom
transfer switch)throughthe wall to outside.
Removethe threadedlocknut fromthe conduitcoupling.
cover.Removeinternalcoverplatescrewand internalcover. []
Lift
Removethe knockout in the lower right cornerof the external
connectionbox.Fromthe rearof the connectionbox,feed wires
& 4 pin plug into box.Slip the locknut overwiresand plug and
tighten securely onto conduit coupling. Using appropriate Ground
fasteners,mountexternalconnectionboxoverpre-drilledholeto Screw
fully concealthe hole. Seal aroundthe hole and conduit with
silicone caulk from both the inside and outside of the home. Knockout
Also,caulk aroundthe sidesand top of the boxto seal the edgesto the siding or wall.
Connectwiresto lugs; Blackto black, white to white, and red to red. Torquenuts to 20
inilbs. Snaptogetherthe 4-pin plugconnector.Loosennut from groundinglugand attach
groundwire (green)fromconduit. Reinstallnut andtighten to 45 in/lbs.Reinstall internal
coverplate and screw.Closecoverand installlock.Thiswiring iscomplete.
Theexternalconnectionboxmustbelockedto
ensuresafetyandtodiscouragetampering.
12.
Locateautomatic transfer switch with built-in emergencyload centerwithin onefoot of
main distribution panel. The automatic
transfer switchwith built-in loadcentercan
be located to the left or right of main
distribution panel. Hold transfer switch
against the mounting surface. Level the
transfer switch and mark the mounting
holes.Drill the appropriatesize pilot holes.
Mountautomatictransfer switchwith built-
in load center to mounting surface with
appropriatefasteners.
13a.
Removethe main electrical distribution panel cover. Remove
appropriatesizeknockoutfromthe bottomorsideofthemainpanel.
(A2-footflexibleconduitis pre-wiredfromthetransferswitchwith
built-in load center.) Removethreaded lock nut from conduit
coupling.Feedall wiresthroughknockoutintomainpanel.Sliplock
nutoverwiresandtightensecurelyonconduitcoupling.Removethe
black(hot) wire from a circuit breakerthat protectsa circuit you
wantto havepoweredinthe eventof a powerfailure.- continuedon