Broan 336 Yard Vacuum User Manual


 
3
1. Remove the cover and screws.
2. Attach an appropriate U.L. approved cable connector in
the hole at the rear of the wiring box.
3. Remove roofing nails from shingles around the TOP and
SIDES of the cutout area only.Carefully lift the shingles
to allow the back flashing sheet on the blower housing to
fit under them.
4. Center the blower ring in the 11" diameter hole, making
sure that the 1¼" diameter electrical wiring hole aligns
with the hole in the wiring box.
5. Attach the blower to the roof with six (6) screws provided.
It is recommended that the screws be located inside the
blower housing. Drill pilot holes if necessary.
6. Using a good grade of roofing cement, seal all of the
shingles around the housing and flashing sheet as well
as the mounting screw heads.
7. Bring electrical wiring through the hole in the wiring box
and secure it according to local codes.
8. Make the electrical connections with the proper connec-
tor for the type of wiring being used. Connect black to
black, white to blue, and the green or bare wire to
grounding screw.
9. Replace cover and screws. Do not pinch wiring under the
cover.
10. Make sure damper opens and closes freely.
1. Place a large bead of caulk on the back side of the
housing all along the outer edges.
2. Center the blower ring in the 11" diameter hole, making
sure that the 1¼" diameter electrical wiring hole aligns
with the hole in the wiring box.
3. Attach blower to the wall with the six (6) screws pro-
vided. It is recommended that the screws be located
inside the blower housing. Drill pilot holes if necessary.
4. Using a good grade of caulk, seal all around the mount-
ing screw heads.
5. Bring electrical wiring through the hole in the wiring box
and secure it according to local codes.
INSTALL THE BLOWER
ROOF INSTALLATIONS
INSTALL THE BLOWER
WALL INSTALLATIONS
BLACK
TO
BLUE
120 VAC
LINE
IN
WHITE
TO
BROWN
GROUND
TO
GROUNDING
SCREW
BLACK
TO
BLUE
120 VAC
LINE
IN
WHITE
TO
BROWN
GROUND
TO
GROUNDING
SCREW
6. Make the electrical connections with the proper con-
nector for the type of wire being used. Connect black to
black, white to blue, and green or bare wire to grounding
screw.
7. Replace cover and screws. Do not pinch wiring under
cover.
8. Make sure damper opens and closes freely.
9. Top and side flanges of the back plate may be covered
with trim strips. Do not block grille opening at bot-
tom with trim. It will adversely affect performance of the
blower.
WHITE
TO
BLUE
BLACK
TO
BLACK
BLACK
TO
BLACK
WHITE
TO
BLUE