Baldor AE12 Portable Generator User Manual


 
Page 32 of 45
Normal Operation:
? Public Service power feeds the ATS which connects to the Emergency Load Center.
? When Public Service power fails, the ATS closes a contact causing GEN to start. Once AC
power from generator is observed at the ATS, the ATS will switch the Emergency Load
Center over to the GEN.
? When Public Service power returns, the ATS will switch the Emergency Load Center back to
Public Service power and open engine start to contact (telling GEN to shut off).
CAUTIONS:
? Emergency load center loads must not exceed GEN's capacity.
? The ATS shall be protected by a circuit breaker appropriate for the ATS rating in the
Customer Primary Load Center.
If you have any questions, contact Baldor Generators for technical support at (920)236-4200.