American Standard 3630 SERIES Outdoor Shower User Manual


 
M968715 Rev.1.1
Turn off hot and cold water supplies before beginning.
CAUTION
5
TEST INSTALLED FAUCET
4
Turn HANDLES into "off" position.
Turn on water supplies and check all connections for leaks.
Operate both HANDLES to flush water lines thoroughly.
Check SHOWER HEAD and connections for leaks.
Turn handles into OFF position.
1
ROUGHING-IN FITTING
ROUGHING-IN SHOWER AND SPOUT
2
Prepare water supplies per "Roughing-in Dimensions."
Install VALVE at indicated height and depth. Notice that finished wall has
to be between the MAX WALL and MIN. which is 1-5/8" below.
Slip COUPLING NUT over supply pipe and screw UNION SWIVEL
to pipe.
For Sweat Connection: Slip COUPLING NUT over 5/8" O.D.
supply tube and solder tube into UNION SWIVEL or female inlet
of valve.
Connect HOT water supply to left VALVE inlet and COLD water
supply to right VALVE inlet. Tighten both COUPLING NUTS firmly.
Secure VALVE BODY to cross brace of wall structure.
ELBOW
ROUGH-IN
NIPPLE
TUB
FILLER
PIPE
SPOUT
3
FINISHING INSTALLATION
Product names listed herein are trademarks of American Standard Inc.
©American Standard Inc. 2000
SERVICE
To change direction of handle rotation,
proceed as follows:
Turn valve to OFF position.
Pull out INDEX CAP and remove
HANDLE SCREW.
Pull off HANDLE BASE and remove
ADAPTER.
Remove SPRING CLIP.
Lift STOP WASHER, turn 90 and replace.
Replace SPRING CLIP.
Reinstall HANDLE. (See step 4).
If spout drips, operate handles several times from OFF to ON
position. Do not force - handles turn only 90 .
SPRING
CLIP
STOP
WASHER
90
CROSS
BRACE
UNION
SWIVEL
SUPPLY
PIPE
COUPLING
NUT
"HOT"
"COLD"
PLASTER
GUARD
ROUGH-IN
NIPPLE
ELBOW
Install SHOWER ARM, SHOWER ARM FLANGE and TUB SPOUT.
Remove caps from roughing-in nipples.
Remove PLASTER GUARD by turning counter-clockwise and pulling.
If VALVE BODY is roughed in SHALLOW (more than 1-1/2") screw
SLEEVE in ESCUTCHEON facing front of ESCUTCHEON.
If VALVE BODY is roughed in DEEP (less than 1-1/2")
screw SLEEVE in ESCUTCHEON facing back of ESCUTCHEON.
Assemble RUBBER RING to ESCUTCHEON.
Screw ESCUTCHEON and SLEEVE onto VALVE COVER against wall.
DEEP ROUGH-IN
LESS THAN
1-1/2"
SLEEVE
SLEEVE
MORE THAN
1-1/2"
ESCUTCHEON
RUBBER
RING
SHALLOW ROUGH-IN
VALVE
BODY
VALVE
COVER
Prepare SHOWER RISER, ELBOW, and roughing-in NIPPLE and
connect to top outlet of VALVE BODY. Outlet is 1/2" female NPT.
Add cross braces to wall structure and secure piping.
Prepare TUB FILLER PIPE, ELBOW and 1/2" N.P.T. SPOUT NIPPLE.
Final length of SPOUT NIPPLE to be 1-1/2" from finished wall.
Cap roughing-in nipples, open supply lines and check for leaks.
Close both valves, turn off water supplies, and replace PLASTER GUARDS.
Finish wall construction.
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
STEM
SOCKET
PLASTER GUARD has a STEM SOCKET to operate valves.
Turn PLASTER GUARD over and push STEM SOCKET onto VALVE STEM.
Open hot and cold valves and check for leaks.
Remove PLASTER GUARDS by turning counter clockwise and pulling. (Do not discard).
HOTLINE FOR HELP
For toll-free information and answers to your questions, call:
1 (800) 442-1902
Weekdays 8:00 a.m. to 7:00 p.m. Eastern Time
IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
SHOWER
ARM
SHOWER
HEAD
"MAX
WALL"
IN MEXICO 01-800-839-12-00