Alamo 3109 Compact Loader User Manual


 
OPERATION
3109 01/11 Operation Section 4-31
© 2011 Alamo Group Inc.
OPERATION
Another method for large dirt piles is to build a ramp
approach to the pile.
It is important to keep the bucket level when
approaching a bank or pile. This will help prevent
gouging the work area.