how to you re load the twine

Asked by E Black on 04/20/2012 2  Answers

ManualsOnline posted an answer 12 years, 7 months ago

The ManualsOnline team has found the manual for this product! We hope it helps solve your problem. Get the Manual Here
0 http://goo.gl/tNGgXR - page 10. INSTALLINg LINE IN REEL EASy STRINg HEAD See Figures 17 - 18. Use .095 in. diameter monofilament line.  Stop the engine and disconnect the spark plug wire.  Cut one piece of line approximately 25 ft. in length.  Rotate knob on string head until line on knob aligns with arrows on top of string head.  Insert one end of line into eyelet located on the side of the string head and push until line comes out through eyelet on the other side. Continue to push line through the string head until the middle section of the line is inside the string head and line outside the string head is evenly divided on each side.  Rotate the knob on the string head to wind the line. If using the C430, knob should be rotated counterclockwise. If using the S430, knob should be rotated clockwise. Wind the line until approximately 8 in. remains protruding from the string head.
Was this answer helpful?
Was this answer helpful?

Add Your Answer

Please Note: Do not submit personal information as it will be displayed online.