BLY / PRE-OPERATION
INSTALL DISCHARGE CHUTE / CHUTE ROTATOR
HEAD (See Fig. 7)
NOTE: The multi-wrench provided inyour parts bag may
be used to install the chute rotator head.
1. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2. Positionchuterotatorheadoverchutebracket. Ifneces-
sary,rotatechuteassemblyto alignsquare and pinonun-
derside ofchute rotator headwith holes in chutebracket.
3. With chute rotator head and chute bracket aligned,
position chute rotator head on pin and threaded stud
of mounting bracket.
4. Install 3/8 washer and locknut on threaded stud and
tighten securely.
CHUTE (_._
ROTATOR 3/8 LOCKNUT
HEAD
3/8 WASHER
PiN
THREADED
STUD
ROTATOR HEAD
CHUTE ALIGN BEFORE MOUNTING
BRACKET TIGHTENING LOCKNUT BRACKET
FIG. 7
INSTALL CHUTE DEFLECTOR REMOTE CONTROL
(See Figs. 8 and 9)
1. Instal] remote cable bracket to discharge chute with
5/16-18 carriage bolt and 5/16-18 Iocknut as shown.
Tighten securely.
2, Install remote cable eyelet to chute deflector with
1,,'4-20 shoulder bolt, nylon washer and 1/4-20 iocknut
as shown, Tighten securely.
3. Install spring hooks between hex nuts on chute rotater
head and into hole in chute deflector as shown.
1/4-20
SHOULDER
SPRING
CHUTE
NYLON
WASHER
1/4-20
LOCKNUT
HOOK
BETWEEN HEX
NUTS
ON CHUTE
ROTATER HEAD
5/16-18
CARRIAGE
CABLE
EYELET
J
_B _EMOTE
CABLE
RACKET
5/16-18
LOCKNUT
FIG. 8
CHUTE DEFLECTOR
CONTROLLEVER
FIG. 9
CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equaltire pressure
is important for best snow throwing performance.
• Reduce tire pressure to 14-17 PSi (19-24,5 N-m).